Builders, tilers and drywall installers

When is the bathroom ready for the tiler?

A flat owner wants a new bathroom. One crew prepares the surfaces and the tiler follows waterproofing. A single day’s delay can mean several calls between the owner, supervisor and both crews.

Bathroom renovation

From enquiry to handover

Where Diriqo saves you work

Both crews see the same sketch and the supervisor can follow the handoff between stages. At billing time the area and agreement for the bath panel are already on record.

01Measure walls and floor separately

Attach measurements, substrate photos and the chosen 30 × 60 cm tile to the job. Record 24 m² of walls and 6 m² of floor separately so both figures are available for the estimate.

02Agree the boundaries of each stage

Separate preparation, waterproofing and tiling in the quote. Agree the niche and the edge by the door with the owner. Keep the note and approved sketch on the job for both trades.

03Pass the bathroom from one crew to the next

The supervisor assigns dates in the calendar. The first crew records what is finished and photos of the waterproofing are added before it is covered. The tiler knows who can confirm the surface is ready before loading up.

04Record extra work before starting it

If the owner also wants the side of the bath tiled, record its area, price and their agreement at the time. The supervisor can distinguish that extra work from the original quote when checking time and materials.

05Walk through the finished details

Inspect the tiles, niche and door edge with the owner. Record any snag with an agreed date and add a photo once it is fixed. Photos of covered work stay with the same bathroom as the handover record.

Open the job record
Scope
Bathroom tiling
Measurements
Walls 24 m² · floor 6 m²
Materials
30 × 60 cm tiles
Completion stages
Waterproofing → tiling

Tools used on this job

Quotes and estimates

Set out the scope, quantities and price for the customer. Before work starts, the supervisor and painter can check which rooms and tasks were agreed.

Scheduling and team

The calendar shows each assigned visit. A supervisor can reassign a job, and the replacement fitter can open the updated appointment and brief on their phone.

Costs and job economics

Compare the agreed job price with materials, labour, transport and other expenses. The supervisor can see which item changed the original calculation.