Diriqo Core · Costs and job economics
What is left of the tiling price once cutter hire is included?
Compare the agreed job price with materials, labour, transport and other expenses. The supervisor can see which item changed the original calculation.
Job example
A bathroom tiling job priced at CZK 24,000
The tiler hands over the bathroom and returns a hired tile cutter. Materials, labour and transport are already recorded. The final hire slip can easily be overlooked.
- Start with the agreed price and recorded costs. The supervisor opens the job figures. The example price is CZK 24,000. Materials cost CZK 8,400, labour CZK 7,200 and transport CZK 1,200, leaving a difference of CZK 7,200 so far.
- Add the last expense to the right bathroom. The tiler brings back the hire slip. The supervisor records one day of cutter hire at CZK 600 on the job. Recorded costs now total CZK 17,400. All example figures exclude VAT.
- Use the figures for the next estimate. After hire, the difference between the price and recorded job costs is CZK 6,600. On the next bathroom the supervisor includes the cutter in the estimate and checks how many days it will be needed.